FOSHAN · HOTEL · VILLA · LARGE PROJECT FURNITURE
Manufacture Your Hospitality & Villa Projects From Concept to Reality.
Delivering Bespoke Furniture Global Projects with BS5852 Standards, Precision Shop-Drawings, and 0% Turnkey Delays. From Foshan to the World.
Quotes ready in 48-72h • 100% NDA Protected • Minimum Order Requirement Applied
01 Service funnel / Project scopes
Which Furniture Scope Do You Handle Today?
Start with the project category that best matches your brief. We will use it to guide you toward the most relevant case studies and project route.
0104 Swipe or use the arrows
03 Project Control System
From BOQ to Reality. One Controlled Project Record.
Keep commercial scope, drawings, material decisions, production records and delivery boundaries connected. Start with the information you have; our Foshan project team will identify what is needed next.
Scope & BOQ
Connect each furniture item to its room, zone, quantity, category and current revision.
ITEM · ROOM / ZONE · QTY · CATEGORY · REVISION
01 Scope & BOQ
Sunny Lam · Global Business Development Director
Message Sunny About Your BOQ
Share your scope directly on WhatsApp
WA WhatsApp ↗
Approved Drawings
Record dimensions, construction details, interfaces and approval status before release.
DIMENSIONS · DETAILS · INTERFACES · APPROVAL
Not sure whether a complex item can be manufactured as intended?
02 Approved Drawings
Cong · Global Design Director
Request a Technical Team Review
Send a sketch or image on WhatsApp
WA WhatsApp ↗
See the Complete Project Control Records Scope, drawings, materials, QC and handover · 01–06
Scope & BOQ Evidence
Item, room, quantity, category and revision reference.
Approved Drawing Evidence
Dimensions, details, interfaces and approval reference.
Materials & Finishes
Identify the current material, colour, texture, hardware and finish reference.
Sample Approval
Record what was submitted, approved, revised or still awaiting a decision.
Production & QC
Connect each batch to its current production and inspection status.
Packing & Handover
Keep item codes, room labels, packing lists and delivery boundaries aligned.
04Case Study / Design vs Reality
We Replicate Exactly As You Envision
Move the divider to compare the client’s original design direction with the delivered physical result.
Drag left or right to inspect the match. Keyboard users can use the arrow, Home and End keys.
The left layer shows the client’s original design or rendering. The right layer shows the delivered physical final output from the same project.
Two Client Highlights
Proof That Continues Beyond the Image
“They met every timeline.”
“exact material replication.”
05 Production Route
How Does a Multi-Category Furniture Project Move from BOQ to Production?
The direct answer
A multi-category order moves through scope review, detailed BOQ assessment, drawing and finish confirmation, sample or first-article approval, coordinated production and batch inspection, then packing and handover planning.
Read the video transcript
- 00:00
Initial Scope Review. Review project type, destination, product categories, quantities and available files.
- 00:03
BOQ & Feasibility. Identify missing specifications, unclear quantities and items requiring further development.
- 00:06
Drawings & Finishes. Align dimensions, construction details, materials, colours, hardware and revisions.
- 00:10
Sample or First Article. Establish the physical or documented reference used for later production checks.
- 00:13
Production & Batch QC. Track category-specific production while maintaining shared item codes and release status.
- 00:17
Packing & Handover. Connect released furniture to packing labels, loading records and the agreed handover point.
Six-stage execution route
Select a stage to play from that chapter07 PRE-PRODUCTION CONTROL
100% Contract Protection & Absolute Precision.
We don’t cut a single board until everything is perfectly aligned. Our Master Project Order connects your initial BOQ directly to exact auto-cad drawings, strict compliance tags (like BS5852), and zero-delay packing milestones. We document everything, so you bear ZERO risk.
08 Packing + Handover Control
No On-Site Chaos. Delivery Tracked Down To The Very Room.
ITEM CODE · ROOM LABEL · PACKING RECORD · LOADING EVIDENCE · HANDOVER POINT
ROOM-LEVEL TRACEABILITY
Live Barcode QA Logging
EXPORT PACKING CONTROL
Armored Ocean Freight Setup
WRITTEN DELIVERY BOUNDARY
Handover Accountability.
PLAN BEFORE ANYTHING MOVES
Plan everything in Foshan with ZERO surprise damages.
Click to get Full Supply Chain Consult↓Customs clearance, final-mile delivery and installation are included only when expressly listed in the written project scope.
Review furniture QC, consolidation and shipping supportFAQ 06 direct answers
Questions Before Project Review and Handover
Clarify the available project information, review boundary, inspection basis, timing variables and destination responsibilities before the working scope is confirmed.
01Can you review a project from a BOQ, drawings or reference images?
Yes. The initial review can begin with any combination of BOQ files, drawings, room schedules, renderings or reference images. Missing information and the next required decisions will be identified during the review.
02Can one project include both fixed and loose furniture?
Yes. Fixed and loose furniture can be reviewed within one project scope, subject to the available specifications, quantities, manufacturing requirements and agreed delivery boundaries.
03What is included in the free initial review?
The initial review identifies the apparent project scope, available information, important gaps and a suitable next step. It is not a confirmed quotation, production commitment or delivery promise.
04How are samples and production batches checked?
Checks should refer to the current approved drawing, material reference, sample, first article or mock-up. The exact checkpoints and acceptance criteria depend on the project specification.
05What can affect the project timeline?
Timing may be affected by scope completeness, drawing approvals, sample decisions, material availability, quantities, production sequence, inspection findings and destination requirements.
06Are customs clearance, final-mile delivery and installation included?
These services are included only when they are expressly identified in the written quotation or order scope. The applicable trade term and handover point should also be stated.