- Input
- Drawings, references, scope and project priorities.
- Decision
- Approve the direction, item scope and key requirements.
- Output
- Approved project brief
CUSTOM FURNITURE MANUFACTURING FROM YOUR DRAWINGS
Custom Furniture Manufacturing from Your Drawings
From approved design to controlled production and final delivery.
Already have CAD drawings, reference images, dimensions, materials or workmanship requirements?
ChiuChiu translates your project information into production-ready specifications, an itemized quotation, approved materials and finishes, controlled manufacturing, documented quality control and export-ready delivery.
You provide the design intent. We provide the manufacturing control needed to build it correctly.
For Interior Designers · Architects · Developers · Procurement Teams · Private Clients
Already have a complete BOQ? See Review OptionsYour files do not need to be packaged perfectly. Our first step is to identify what is ready, what is missing and what requires approval.
Defined Product → Approved Specification → Comparable Price
One accountable workflow Approval before production Evidence before shipment
Villa Furniture Breakdown · Dimensions / Construction / CMF
02 MANUFACTURING CAPABILITY
Depth Behind Every Piece. Control Around Every Decision.
Reliable manufacturing is not one machine or one sales desk. Product development, material sourcing, woodworking, finishing, upholstery, inspection, packing and project communication work from the same approved record.
- 01 Foshan / Shunde Manufacturing coordination
- 02 Factory-Side Production accountability
- 03 Export-Ready Inspection and release
Want to see the production system behind the project?
Explore Our Foshan Manufacturing SystemFOSHAN MANUFACTURING Woodworking
03 / ONE STANDARD, EVERY PROJECT
Hotel-Tier Discipline. Bespoke Execution.
The same habits used to coordinate hospitality furniture - controlled submittals, recorded approvals, inspection evidence and pre-shipment sign-off - are applied to bespoke residential and commercial projects. The design may be unique; the control process should never be improvised.
See Hotel Furniture ManufacturingFour controls. One accountable standard.
SELECT A STANDARD TO VIEW THE RELATED STAGEHospitality project evidence
03 PROJECT ENVIRONMENTS Swipe to view all three projects →
04 / CONTROLLED PROJECT WORKFLOW
One Accountable Path from Design Intent to Delivery.
Your project moves through a sequence of reviewable decisions. At every stage, you can see what information is being used, what requires approval and what document allows the project to move forward.
See the Complete Design-to-Delivery Workflow →- Input
- Approved brief, dimensions and site conditions.
- Decision
- Confirm construction logic and the current drawing revision.
- Output
- Shop drawings and technical breakdown
- Input
- Technical questions, comments and requested changes.
- Decision
- Resolve open points and accept the revision record.
- Output
- Clarification and revision log
- Input
- Material samples, finish references and mock-ups.
- Decision
- Approve, revise or reject the proposed CMF basis.
- Output
- Approved sample or CMF record
- Input
- Approved drawings, CMF record and production release.
- Decision
- Confirm corrective action for reported variances.
- Output
- Progress updates and QC evidence
- Input
- Final QC status, packing and delivery information.
- Decision
- Confirm shipment timing and handover responsibilities.
- Output
- Packing and handover plan
05 / REFERENCE WORK, BESPOKE OUTCOME
Past Work Proves Direction. Your Specification Defines the Result.
Reference projects show our ability to understand a material language, detailing level and complete furniture programme. They are evidence of relevant execution - not templates. Your drawings, dimensions, CMF schedule and workmanship requirements remain the authority for your project.
View Villa ProjectsProduction capabilities shown in context
Whole-Home Furniture Programme
Whole-Home Coordination
Furniture developed consistently across connected rooms.
Coordinated Multi-Room Interior
Material Continuity
Wood, stone, metal and upholstery coordinated as one palette.
Bespoke Seating Collection
Bespoke Upholstery
Proportion, comfort, tailoring and fabric application controlled by item.
Detailed Residential Interior
Complex Forms and Finishes
Sculptural forms and detailed finishes translated into production requirements.
06 / YOUR PROJECT TEAM
One Project Team. Clear Ownership at Every Stage.
Your drawings should not be reinterpreted by disconnected departments. One coordinated project team carries the approved information through technical review, BOQ and quotation, material approval, factory supervision and quality reporting.
One record. Four accountable roles.
RECORD DRAWINGS · BOQ · CMF · QC
A named owner for every decision.
Project Lead
Owns the timeline, meeting record, key decisions and client communication.
Project Coordination
Maintains the BOQ, quotation, sourcing status and approval log.
Design and Engineering
Translates design intent into dimensions, materials and production-ready details.
Factory Supervision
Checks feasibility, production status, corrective action and pre-shipment readiness.
Owns the timeline, meeting record, key decisions and client communication.
TIMELINE · DECISIONS · COMMUNICATIONMaintains the BOQ, quotation, sourcing status and approval log.
BOQ · QUOTATION · SOURCING · APPROVALSTranslates design intent into dimensions, materials and production-ready details.
DRAWINGS · DIMENSIONS · MATERIALS · DETAILSChecks feasibility, production status, corrective action and pre-shipment readiness.
FEASIBILITY · STATUS · CORRECTION · RELEASE07 / CHOOSE YOUR SERVICE SCOPE
Already Have the Design? Start with Manufacturing.
You do not need to purchase another design package. If your drawings and specifications are ready, we begin with manufacturability review, item breakdown, CMF confirmation, quotation and production planning. If critical information is missing, add only the drawing-deepening support required to close the gaps.
Files You Can Provide
- CAD or PDF drawings
- Reference images
- Dimensions and quantities
- Materials and finishes
- Workmanship requirements
Service Output
- Manufacturability review
- Clarification list
- Item breakdown
- CMF approval plan
- Spec-linked quotation
- Production and QC plan
Use this path when dimensions, construction details, joinery, material codes or room coordination are incomplete.
Typical information gaps
- 01Dimensions
- 02Construction details
- 03Joinery
- 04Material codes
- 05Room coordination
08 / ITEM SCHEDULE
Every Piece Gets a Production Identity Before It Is Priced.
Before a product is quoted or manufactured, it is registered by room, location, item code, dimensions, quantity, orientation and reference. This turns a collection of drawings and images into a traceable furniture schedule.
Six fields connect every item.
- 01Item Code
- 02Room and Location
- 03Product Description
- 04Dimensions
- 05Quantity and Handing
- 06Reference and Revision
Selected Furniture Identity
Single-arm two-seat sofa · Right-hand
Two linked production records
Select either record to update the image, item code and active marker on the left.
Item LIV-2S-RH-01 is selected.
09 / PRODUCT BREAKDOWN
We Break the Design Down Until the Factory Does Not Have to Guess.
For each product, we record overall dimensions, construction, frame, filling, upholstery, visible surfaces, hardware, special craftsmanship and unresolved questions. This removes guesswork before pricing, sampling and manufacturing.
Full furniture breakdown page is visible.
Full Product Breakdown
10 / CMF APPROVAL
Approve Colour, Material and Finish in the Real World.
Subjective descriptions are converted into coded physical samples. Fabric, leather, veneer, stone, metal tone, paint colour and surface sheen are reviewed against the same item record before production release.
Colour + Material + Finish, connected to a named furniture item and a recorded approval status.
Filter the evidence, then select a sample to inspect its record.
Six material decisions. One traceable item record.
Example Record
EX-FAB-01
- Sample Code
- EX-FAB-01
- Material Category
- Fabric
- Colour, Texture and Sheen
- Deep navy / tactile woven texture / low sheen
- Applied Item
- LV-CH-01 / Lounge chair upholstery
- Substitution Rule
- No substitution without matching colour, hand-feel, weave performance and written approval.
- ✓ Submitted Completed
- ✓ Reviewed Completed
- ● Approved Current
Example fields shown for workflow demonstration. Replace these codes and statuses with the approved record for the live project.
11 / ITEMIZED QUOTATION
A Quotation You Can Audit Line by Line.
Price is connected to a defined item, dimension, quantity, material, finish, build level and inclusion. Alternative options are shown separately, so a lower price cannot hide an unapproved change in specification.
01
ITEM BASIS
02
STANDARD CUSTOM
03
PRICE BASIS / REDACTED
CC39007-022 / Option 01
- Dimensions
- 220 × 105 × 110 / source unit not stated
- Quantity
- 2 pcs
Standard Custom
MDF + solid wood frame / standard lacquer / engineered veneer
Commercial value redacted
Unit: redacted / Total: confirmed after final scope
One product basis. Three separately stated build options.
Hover, focus or select an option to match it with the document above.
Source-note: the example does not state an explicit unit for the reference dimensions or separate included/excluded-work columns. Those fields remain identified for formal quotation confirmation instead of being invented here.
Understand the difference before requesting a formal quotation.
General direction before commitment.
- General project understanding
- Rough price direction
- Initial scope and readiness discussion
This is not a formal purchase, tender or contractor quotation.
Detailed analysis and formal project documents.
- Item-by-item BOQ review and classification
- Material, finish and production-feasibility review
- Formal PDF / XLSX factory quotation
- Fully deductible from a future furniture order
A free initial review provides general project understanding and a rough price direction. Detailed item-by-item BOQ analysis and a formal PDF/XLSX quotation are covered by the $500 Project Start Fee, deductible from a future furniture order.
12 / QUALITY GRADES AND VALUE ENGINEERING
Choose the Build Level with Every Trade-Off Visible.
A lower price is useful only when you can see what changes. Each option is defined by construction, material, finish, durability and design fidelity before it enters the quotation.
Select one lens to isolate that trade-off across all five build levels.
All six comparison dimensions are visible.
Simplified construction, materials and surface detailing.
- Construction
- Simplified support and assembly methods.
- Material
- Economical, approved alternatives.
- Finish
- Standardised surface detailing.
- Durability
- Defined for lighter-duty applications.
- Design Fidelity
- Essential silhouette and function retained.
- Best Use
- Secondary or tightly budgeted spaces.
Protects the main visual character while controlling less-visible cost.
- Construction
- Reinforced where performance matters most.
- Material
- Key visible material character protected.
- Finish
- Main visible details retained.
- Durability
- Balanced for regular residential use.
- Design Fidelity
- Primary proportions and visual cues retained.
- Best Use
- Value-led residential furniture packages.
Reliable construction and repeatable finishes for coordinated project use.
- Construction
- Reliable, repeatable project structure.
- Material
- Coordinated project-grade selections.
- Finish
- Controlled for repeatable batch consistency.
- Durability
- Suited to coordinated project use.
- Design Fidelity
- Balanced across the complete programme.
- Best Use
- Multi-room residential or commercial projects.
Upgraded structure, materials and finishing for closer design fidelity.
- Construction
- Upgraded internal structure and support.
- Material
- Upgraded visible and internal materials.
- Finish
- Refined detailing and tighter tolerances.
- Durability
- Prepared for frequent, long-term use.
- Design Fidelity
- Closer to the approved design reference.
- Best Use
- Principal rooms and high-use spaces.
Maximum fidelity and the highest level of material and detail control.
- Construction
- Detail-specific premium build method.
- Material
- Highest approved material basis.
- Finish
- Maximum craftsmanship and surface control.
- Durability
- Highest specified performance basis.
- Design Fidelity
- Maximum fidelity to approved intent.
- Best Use
- Signature and statement furniture pieces.
Illustrative build-level framework. Final construction, materials, finish and performance are confirmed item by item before quotation and production release.
One furniture identity. Three specification control areas.
These three details come from the same Villa furniture breakdown record. Select one to compare its related dimension above.
Source evidence: P12 quality-grade comparison and Villa Furniture Breakdown / CMF verification. Images illustrate the review method; the approved project specification governs.
When the price changes, the specification changes visibly - not through a hidden downgrade.
No build level carries a fixed price. Each quotation follows the item-specific approved basis.13 / ENGINEERING AND DOCUMENTED QC
Nothing Is Cut Before the Approved Details Are Clear.
Before materials are released, design intent is translated into buildable shop drawings. Critical dimensions, frame construction, joints, upholstery build-up, hardware, interfaces, finish codes and tolerances are reviewed. The approved revision becomes the shared baseline for production and inspection.
The factory and the inspector work from the same approved revision.One approved production baseline.
CMF code and approved material reference
- Shop Drawings
- BOM / BOQ
- Construction Details
- Hardware Schedule
- CMF Codes
- Approved Revision
Check while correction is still possible.
-
Material type, colour, grain, thickness and approved reference.
-
Dimensions, joints, reinforcement and structural stability.
-
Construction, upholstery build-up, alignment and accessible details.
-
Dimensions, appearance, function, stability and finish quality.
-
Quantity, accessories, labels, condition and packing readiness.
Material Inspection is highlighted on the engineering record.
- Approved Revision
- Production
- Inspection Record
- Corrective Action
- Release
Deviations are found while they can still be corrected - not after the container arrives.
14 / LOGISTICS, DELIVERY AND AFTERCARE
We Do Not Just Ship Furniture. We Prepare It to Land.
A shipment is successful only when the receiving team can identify, handle, assemble and report every item correctly. The furniture schedule remains connected to packing lists, case marks, packing photos, hardware lists and installation information.
Five accountable handover points.
- 01
Factory Release
- 02
Export Handover
- 03
Site Receipt
- 04
Installation Support
- 05
Issue Closure
Files that let the shipment land correctly.
Item-Coded Packing List
Room and Case Marks
Packing Photos
Hardware and Accessories List
Assembly Instructions
Container Loading Record
Arrival Issue Record



15 / EXPORT PACKAGING
Packaging Is Engineered Around the Piece.
Upholstery, veneer, lacquer, metal, glass and stone have different surfaces, weights and weak points. Their protection, support and outer-pack structures are therefore selected according to the product and delivery route.
- Item Code Verified
- Quantity Verified
- Packing Method Recorded
- Loading Position Recorded
16 / PROJECT DELIVERY TIMELINE
Plan Backwards from the Required Arrival Date.
A reliable lead time starts with approval gates, not a production guess. Engineering, material approval, manufacturing, QC, packing, freight and installation must be planned as one connected path.
- 01APPROVAL GATE
Engineering and Approvals
Depending on file completeness and approval speed.
- 02CHOOSE ONE PATH
Production
Custom and catalogue production are alternative paths, not cumulative stages.CUSTOM PRODUCTION ORAfter drawings, materials and commercial scope are approved.
CATALOGUE PRODUCTION When catalogue products are selected.
- 03RELEASE GATE
Final QC and Packing
After production completion.
- 04ROUTE EXAMPLE
Ocean Freight Example
China to Costa Rica in the PDF reference scenario.
Other destinations require a route-specific estimate. - 05SITE GATE
Installation
When installation is included and the site is ready.
WHAT CAN CHANGE THE DATE
- Approval speed
- Sample revisions
- Material availability
- Production period
- Freight route
- Site readiness
The target date becomes credible only when every approval and handover date has an owner.
17 / FROM TODAY TO PROJECT KICKOFF
Send the Package You Already Have.
Send your drawings, BOQ, reference images, dimensions, material requirements, destination and target date. We will organize the available information and show you the appropriate next step.
YOUR PROJECT INPUT PACKAGE
START WITH WHAT IS AVAILABLE- CAD, DWG or PDF Drawings
- BOQ or Furniture Schedule
- Reference Images or Renderings
- Dimensions and Quantities
- Materials, Colours and Finishes
- Workmanship or Performance Requirements
- Delivery Destination
- Required On-Site Date
Do not have every file yet? Start with the information available. We will identify what is missing.
Free Initial Review
Clients who need an initial conversation, general project understanding and early budget direction.
INCLUDES
- 15-20 minute project call
- General project understanding
- Rough price range
SCOPE LIMITThe free review does not include item-by-item BOQ analysis, detailed material recommendations, formal production feasibility checking, a detailed schedule or a formal factory quotation.
Request a Free Initial Review$500 Detailed BOQ Review
Projects ready for item-by-item factory analysis, detailed pricing and production planning.
INCLUDES
- BOQ review and item classification
- Item-by-item factory quotation
- Material and finish suggestions
- Production feasibility check
- Production complexity review
- Timeline estimate
- Shipping direction
- Formal PDF / XLSX quotation
The $500 Project Start Fee is fully deductible from your future furniture order.
Start Detailed BOQ Review - $500Four steps to project kickoff.
- 01
Confirm the Review Path
Choose the free initial review or detailed BOQ review.
- 02
Create the Project Record
Organize files, contacts, scope and decision responsibilities.
- 03
Receive Manufacturing Review V1
Identify missing information, risks and required approvals.
- 04
Approve the BOQ and Production Path
Confirm the commercial scope and route toward sampling or production.
