ChiuChiu Furniture supports custom furniture projects for hotels, villas and large commercial spaces from Foshan—from BOQ and drawing review to finish approval, production coordination, quality inspection, export packing and handover planning.
Start with the project files you already have. Feasibility, pricing, timing and responsibilities are confirmed after the current project scope is reviewed.
Initial review only. Feasibility, pricing, timing and delivery responsibilities are confirmed against the current project files and written scope.
02 Project route
Which Project Route Fits Your Furniture Scope?
The right project route depends on the property type, furniture categories, available drawings, quantities, approval stage, destination and requested delivery scope. Select the closest route first; detailed feasibility and commercial terms are confirmed after the current project information is reviewed.
0104 Swipe or use the arrows
03 Project Control System
What Keeps a Custom Furniture Project Under Control?
A custom furniture project stays controllable when one current scope connects the BOQ, approved drawings, material and finish references, sample decisions, production status, inspection findings, packing labels and handover responsibilities.
-
01 Current scope record Scope & BOQ
Connect each furniture item to its room, zone, quantity, category and current revision.
ITEM · ROOM / ZONE · QTY · CATEGORY · REVISION
Record type · BOQ / room matrix -
02 Technical release record Approved Drawings
Record dimensions, construction details, interfaces and approval status before release.
DIMENSIONS · DETAILS · INTERFACES · APPROVAL
Record type · shop drawing review -
03 CMF reference record Materials & Finishes
Identify the current material, colour, texture, hardware and finish reference.
MATERIAL · COLOUR · TEXTURE · HARDWARE · FINISH
Record type · illustrative material / finish reference -
04 Decision record Sample Approval
Record what was submitted, approved, revised or still awaiting a decision.
SUBMITTED · APPROVED · REVISED · PENDING
Record type · sample decision sheet -
05 Batch status record Production & QC
Connect each batch to its current production and inspection status.
BATCH · STAGE · CHECK · FINDING · STATUS
Record type · inspection check reference -
06 Delivery boundary record Packing & Handover
Keep item codes, room labels, packing lists and delivery boundaries aligned.
ITEM CODE · ROOM LABEL · PACKING LIST · BOUNDARY
Record type · packing mark / handover label
04 Fixed + Loose Furniture
Which Fixed and Loose Furniture Categories Can Be Reviewed?
A project may combine cabinetry, hotel casegoods, upholstered seating, dining furniture, beds, headboards and bespoke loose pieces. Each category is reviewed against its location, dimensions, materials, quantities, intended use and delivery or installation boundary.
Select every category that belongs in the current project scope.
Reference routesBrowse Reference Examples
Reference examples support scope discussion only. Selecting a category does not add a product to a cart or confirm feasibility, specification or price.
05 Production Route
How Does a Multi-Category Furniture Project Move from BOQ to Production?
The direct answer
A multi-category order moves through scope review, detailed BOQ assessment, drawing and finish confirmation, sample or first-article approval, coordinated production and batch inspection, then packing and handover planning.
Read the video transcript
- 00:00
Initial Scope Review. Review project type, destination, product categories, quantities and available files.
- 00:03
BOQ & Feasibility. Identify missing specifications, unclear quantities and items requiring further development.
- 00:06
Drawings & Finishes. Align dimensions, construction details, materials, colours, hardware and revisions.
- 00:10
Sample or First Article. Establish the physical or documented reference used for later production checks.
- 00:13
Production & Batch QC. Track category-specific production while maintaining shared item codes and release status.
- 00:17
Packing & Handover. Connect released furniture to packing labels, loading records and the agreed handover point.
Six-stage execution route
Select a stage to play from that chapterWRITTEN SCOPE · APPROVALS · RESPONSIBILITY
What Should Be Confirmed in Writing Before Production Starts?
Before custom furniture production begins, the current order file should connect the contracting parties, furniture scope, specification attachments, approved revisions, commercial milestones, inspection basis, packing requirements and delivery responsibilities.
Clear written records help the project team identify what has been approved, what is still pending and which document controls the next decision.
Current project record
Project Order File
One current record connecting scope, approvals, production release and handover responsibilities.
01 Parties & Furniture ScopeBOQ or furniture schedule
Identify the contracting parties and connect every included furniture item to its category, room or zone, quantity and current item code.
- Contracting-party details
- Current BOQ or furniture schedule
- Room, zone, quantity and item codes
02 Specification AttachmentsDrawings and material samples
Reference the current BOQ, approved drawings, materials, finishes, hardware requirements, samples and relevant technical documents.
- Current BOQ and approved drawings
- Material, finish and hardware schedule
- Sample and technical-document references
03 Price & Commercial MilestonesAbstract milestone record
State the agreed price basis and connect payment events to clearly defined commercial or project milestones.
- Agreed price basis
- Commercial or project milestone schedule
- Conditions connected to each payment event
04 Revision & Change ControlRevision-marked drawing
Record what changed, which furniture items are affected, who approved the change and whether price or timing requires further confirmation.
- Revision register and affected-item list
- Written change approval
- Price or timing impact status
05 Inspection & Production ReleaseQC and release record
Define the approved inspection reference, reporting method, corrective-action process and the conditions required before a batch is released.
- Approved inspection reference
- Checklist, findings and corrective actions
- Reinspection or production-release status
06 Packing, Delivery & After-SalesPacking or handover record
Confirm the packing standard, trade term, named handover point, destination responsibilities and the process for reporting a nonconformity or after-sales issue.
- Packing standard and labels
- Trade term, handover point and responsibilities
- Issue-reporting and supporting-evidence route
Written records help define project responsibilities, but they do not create an automatic guarantee of compensation, delivery performance or legal outcome. Rights and remedies depend on the signed agreement, supporting evidence and applicable law.
Explore procurement support for contractors and buildersYour current status: 4 of 6 project controls available
08 Packing + Delivery + FAQ
How Are Furniture Items Released, Packed, Labelled and Handed Over?
Released furniture should remain connected to its item code, room or zone, packing identity and current packing list. Protection, labels, loading evidence, trade term, named handover point and destination responsibilities must match the written scope.
-
01
Release Status
Confirm that the furniture item or batch has been released against the agreed reference.
-
02
Label & Protect
Apply packaging protection and labels connected to the item, room or project zone.
-
03
Packing & Loading Records
Record packing-list information and relevant loading evidence.
-
04
Destination Handover
Confirm the written handover point and the responsibilities that apply after it.
FAQ 06 direct answers
Questions Before Project Review and Handover
Clarify the available project information, review boundary, inspection basis, timing variables and destination responsibilities before the working scope is confirmed.
01 Can you review a project from a BOQ, drawings or reference images?
Yes. The initial review can begin with any combination of BOQ files, drawings, room schedules, renderings or reference images. Missing information and the next required decisions will be identified during the review.
02 Can one project include both fixed and loose furniture?
Yes. Fixed and loose furniture can be reviewed within one project scope, subject to the available specifications, quantities, manufacturing requirements and agreed delivery boundaries.
03 What is included in the free initial review?
The initial review identifies the apparent project scope, available information, important gaps and a suitable next step. It is not a confirmed quotation, production commitment or delivery promise.
04 How are samples and production batches checked?
Checks should refer to the current approved drawing, material reference, sample, first article or mock-up. The exact checkpoints and acceptance criteria depend on the project specification.
05 What can affect the project timeline?
Timing may be affected by scope completeness, drawing approvals, sample decisions, material availability, quantities, production sequence, inspection findings and destination requirements.
06 Are customs clearance, final-mile delivery and installation included?
These services are included only when they are expressly identified in the written quotation or order scope. The applicable trade term and handover point should also be stated.