Custom furniture for hotel guestrooms and public spaces, with support for drawings, samples, manufacturing and shipment coordination. Explore our 408-suite project and discuss the requirements for your next hotel.

Explore Hotel Project Support
Watch the 408-Suite Hotel Project · 1:04 Watch on YouTube ↗

Drawings · Samples · Manufacturing · Shipment coordination

CONFIDENTIAL PROJECT REFERENCE

A 408-Suite Hotel Furniture Project

The project scope covered 408 guestroom furniture packages and custom lobby furniture, including large curved sofas. Technical drawing support, mock-up development and coordinated wood, metal and upholstery production supported the furniture delivery.

408Guestroom furniture packages
Project facts from the original 408-suite hotel project video description
Project typeFive-star hotel
Guestroom scope408 furniture packages
Public spacesCustom lobby furniture
ManufacturingWood, metal and upholstery
Technical supportDrawings and mock-up development
Source: original project video ↗

FURNITURE BY SPACE

Furniture for Guestrooms and Public Spaces

Coordinate furniture across the spaces your guests use every day. Define each area’s quantities, dimensions, finishes and installation requirements within one clear project scope.

Hotel guestroom with a bed, wood headboard, bedside furniture and a desk area, shown as a space reference

Guestrooms & Suites

Beds, headboards, bedside tables, desks and wardrobes.

Hotel lobby lounge with sofas, armchairs and occasional tables, shown as a space reference

Lobby & Lounge

Sofas, lounge chairs, occasional tables and bespoke seating.

Hotel restaurant with dining tables, chairs and upholstered seating, shown as a space reference

Restaurant & Dining

Dining tables, chairs and banquette seating.

MATERIALS & FINISHES

Materials and Finishes Defined for Your Project

Select materials and finishes around your design, budget and operational requirements. Record approved references so the production team has a clear specification to follow.

Wood & Veneer

Confirm wood species, finishes and colors.

Upholstery

Specify fabric or leather, with cleaning and care requirements.

Metal & Stone

Review surface treatments, texture and edge details.

Project Requirements

Confirm applicable performance or test requirements for the target market.

PRODUCTION & INSPECTION

Quality Checks Against Approved Specifications

Review furniture against the agreed drawings and samples. Inspection records can cover dimensions, materials, finishes, hardware operation and packing identification, according to the project scope.

Workers, timber panels and workstations on the furniture factory floor
Woodworking on the factory floor
  • Gloved hands measuring a round tabletop with a tape measure

    Dimensions & Construction

    Compare dimensions and connections with the approved drawings.

    Record: measurements and drawing revision.

  • Close view of leather upholstery and seam details on an armrest

    Materials & Finishes

    Review finish color, upholstery and seams against approved samples.

    Record: sample references and detail photos.

  • A person opening a drawer to review cabinet operation

    Function & Hardware

    Check drawer, cabinet door and hardware operation.

    Record: functional observations and item reference.

  • Furniture under protective wrapping with a staff member documenting it on a phone

    Packing & Identification

    Review protective packing, carton marks and item identification.

    Record: packing photos and identification references.

PRODUCTION & DELIVERY

Plan Production and Delivery Around Your Project

Build the schedule around specification approval, sample requirements, production, inspection and transportation. Confirm shipment arrangements and responsibilities for receiving, unloading and installation before dispatch.

  1. Approvals

    Confirm specifications, materials and sample requirements.

  2. Production

    Plan manufacturing around the approved project scope.

  3. Inspection

    Review the agreed checks before shipment preparation.

  4. Packing

    Prepare protection, case marks and the packing list.

  5. Shipment

    Confirm the route, dispatch arrangements and receiving responsibilities.

Production time and transportation time are planned separately.

The schedule varies with project scale, material availability, sample and mock-up requirements, and destination. Share your target on-site date so each stage can be reviewed around your project.

Workers fitting a wooden outer crate around protectively wrapped furniture

Protective Packing

Select surface protection and outer packing to suit the furniture and transport route.

Wooden furniture crates with attached shipping labels prepared in the workshop

Case Marks

Link case marks and item identification to the agreed packing list.

Forklift and packed furniture beside an open container truck in the factory loading area

Container Loading

Coordinate loading, dispatch and the agreed handover arrangements.

ADDITIONAL HOTEL REFERENCES

More Hotel Furniture Project References

Explore additional hotel interiors and furniture scopes to assess their relevance to your project. Review the areas supplied, furniture details and the role handled by our team.

Wooden tables and upholstered seating shown in the Marriott Hotel Hangzhou project gallery
Interior furniture shown in the published Hangzhou project gallery

Marriott Hotel Hangzhou

Location
Hangzhou, China
Furniture Scope
Fixed joinery and loose furniture for guestrooms and suites, lobby and lounge, restaurants and poolside areas.
Our Role
Furniture design and manufacturing
View Project Details
Lounge seating and occasional tables shown in the Courtyard by Marriott Nanjing project gallery
Lounge interior shown in the published Nanjing project gallery

Courtyard by Marriott Nanjing

Location
Nanjing, China
Furniture Scope
Details available on request
Our Role
Details available on request
View Project Details

PROJECT QUESTIONS

Questions Before Starting Your Hotel Furniture Project

Project professionals discussing drawings and pointing to plans on a table; illustrative stock photograph
Drawing review and project planning · Illustrative photo
What do you need to review my project?

Share your project country, number of rooms, furniture areas and approximate quantities, BOQ or drawings, and target on-site delivery date. If your documents are still developing, start with reference images and explain what is confirmed and what still needs review.

Can you manufacture from our drawings?

Yes. We first review dimensions, construction details and installation interfaces, confirm materials and finishes, and assess manufacturing feasibility. Any unclear specifications or suggested adjustments need to be agreed before the drawings are approved for production.

Can we approve a mock-up before production?

Yes, where a sample or mock-up is agreed for your project. Its furniture scope, preparation cost, lead time, delivery arrangements and approval method are confirmed before work starts. Production is planned around the agreed approval process.

What determines the project lead time?

Lead time depends on quantities, material availability, design complexity, sample or mock-up requirements, and revision rounds. Confirm the production schedule after the key specifications and approvals are agreed. Transportation is planned separately around the route and destination.

What is included in the quotation?

The quotation should identify the furniture items, quantities, materials and finishes being priced. Samples, shop drawing development, transportation, customs support and installation are included only when expressly listed in the agreed scope; otherwise, they are priced separately or excluded.

Is a detailed BOQ review chargeable?

Yes. A free initial review can provide a general price range from the information you share. Detailed BOQ analysis, production feasibility review and item-by-item factory quotation require a paid Project Start Fee. Review the current fee, deliverables and order-credit terms before starting this service.