Wood & Construction
Ask which components use solid wood, veneer or engineered board. Review the frame and joint construction, then confirm that the agreed specification appears in your quotation and production documents.
Explore Wood Materials
INSIDE FOSHAN · A BUYER’S GUIDE
Beautiful furniture starts with informed decisions. Explore how to compare materials, understand quotations and plan your order—from the workshops of Foshan to your destination.
Watch our factory-side film, then use the practical checklists below to prepare your own furniture project.
For homeowners, interior designers and project buyers.
02 / INSIDE FOSHAN
Start with five things: the product specification, total order cost, customization requirements, inspection arrangements and delivery responsibilities. Confirm these in writing before placing an order.
In this 15-minute film, Jack introduces Foshan’s furniture supply chain and the decisions behind the finished product—from materials and craftsmanship to sourcing, inspection and shipping.
Inside Foshan · ChiuChiu Furniture · 15:46
Explore the chapters
UNDERSTAND THE PEOPLE BEHIND THE PRODUCT
A showroom helps you explore a style. A production discussion helps you understand how it will be made. Before ordering, confirm who is responsible for the specifications, manufacturing, inspection and shipment of each item.
For an order covering several rooms, ask whether different categories will come from different workshops—and how their finishes, quantities and production schedules will be coordinated.
ChiuChiu supports custom furniture projects from Foshan, China. Sharing your requirements early helps the team discuss the appropriate scope of sourcing and technical support.
COMPARE LIKE FOR LIKE
A lower unit price does not tell you whether two quotations include the same furniture—or the same delivery responsibilities. Compare the specification and complete order scope before deciding which offer represents better value.
| What to Compare | What to Confirm |
|---|---|
| Furniture specifications | Item codes, dimensions, quantities, materials, upholstery, hardware and finishes. |
| Customization and samples | Drawing requirements, sample costs, revisions and any additional development work. |
| Inspection and packaging | Inspection scope, protective packaging, labelling and carton or crate requirements. |
| Shipping and destination costs | Transport, insurance, applicable destination charges and the agreed delivery point. |
Ask for a written breakdown of what is included and excluded. A useful comparison is based on equivalent specifications and the same destination—not a headline discount.
Related film chapter: 05:57 — Factory Prices and Retail Prices.
THE DETAILS THAT DESERVE A CLOSER LOOK
Similar-looking furniture can have different construction, upholstery and finishing specifications. Use these three areas to ask more precise questions before you order.
Ask which components use solid wood, veneer or engineered board. Review the frame and joint construction, then confirm that the agreed specification appears in your quotation and production documents.
Explore Wood Materials
Request the exact upholstery description and an approved material sample. Confirm where each material will be used, and compare texture, colour and stitching rather than relying on the word “premium”.
Explore Leather Options
Confirm the finish colour, sheen and reference sample. For coordinated rooms, discuss how visible variation will be reviewed across the table, seating, cabinetry and other furniture pieces.
Discuss Custom Materials and FinishesFROM INSPIRATION TO SPECIFICATION
A reference image communicates a look. Production needs dimensions, materials, quantities and an agreed finish. Define these details before the order moves forward.
Send your floor plan, furniture list, reference images, quantities, destination and target arrival date.
Discuss proportions, dimensions, construction, materials and any requirements specific to your project.
Confirm the quotation, samples, drawing requirements and service inclusions before authorising production.
Record the planned production, inspection, packing and shipping stages, including how changes will be handled.
BEFORE YOUR ORDER LEAVES
Ask how the finished furniture will be compared with your approved specification and what evidence you will receive before shipment.
Order accuracy: item codes, quantities and key dimensions.
Material matching: upholstery, colour and finish against approved references.
Workmanship: visible surfaces, stitching, joints and fittings.
Condition and function: damage, completeness and agreed functional checks.
Packing readiness: protection, labels and the shipment list.
PLAN THE COMPLETE JOURNEY
Shipping arrangements and timing depend on the order and destination. Ask your supplier to separate production timing from transportation and local delivery, and to identify what the quoted shipping scope includes.
Share the destination country, city and site requirements early so the delivery plan can be discussed alongside your furniture selection.
CHOOSE THE SUPPORT YOUR PROJECT NEEDS
Compare furniture in person and discuss how a sourcing visit can fit your style, budget and purchasing plans.
Bring your references, drawings or furniture selection to a discussion about specifications, materials and technical requirements.
Use your room list or BOQ to discuss quantities, material requirements and a clearly defined quotation scope.
Service inclusions, fees and availability are confirmed for your project.
There is no fixed saving that applies to every order. Compare equivalent materials, dimensions, construction and quantities, then include the agreed transportation and destination costs. A lower factory price alone does not establish the final saving.
Ask for a written specification, material samples where appropriate and clear construction details. Agree which samples or drawings need approval and how the finished furniture will be inspected against them.
ChiuChiu supports custom furniture discussions. Feasibility, material availability, minimum quantities and costs depend on the item and project. Send your references and dimensions so the team can review your requirements.
Request a schedule for your particular order. Allow for specification review, approvals, production, inspection, packing and delivery. A production estimate should not be treated as the date the furniture will arrive at your site.
Send your furniture list or BOQ, quantities, floor plan, reference images, material preferences, destination, target date and estimated budget. Identify any missing details so they can be clarified before the quotation is finalised.
Check the written quotation. Ask for the agreed delivery point, included services, exclusions and responsibility for destination costs. Do not assume the product price includes all local services.
YOUR PRE-ORDER CHECKLIST
Keep one approved record that connects your furniture selection with the quotation, production requirements and delivery plan.
| Decision | Your Record Should Include |
|---|---|
| What you are buying | Item list, quantities, dimensions and material specifications. |
| What has been approved | Drawings, swatches, finish references and agreed revisions. |
| What you are paying for | Price, payment stages, included services and exclusions. |
| How it will be checked | Inspection scope, reporting and discrepancy handling. |
| How it will reach you | Production milestones, packing, shipping scope and destination responsibilities. |
FROM AN IDEA TO A DEFINED PROJECT
Share the space, the furniture you need and where it will be delivered. The ChiuChiu team can discuss the relevant next step for sourcing, customization or a project quotation.
To help us understand your project, include: