Align the project direction before individual items move into development.
- Input
- Drawings, reference images, scope and project priorities
- Decision
- Confirm the design direction, item scope and key requirements.
- Output
- Approved project brief

CUSTOM FURNITURE MANUFACTURING FROM YOUR DRAWINGS
From approved design to controlled production and final delivery.
Already have CAD drawings, reference images, dimensions, materials or workmanship requirements?
ChiuChiu translates your project information into production-ready specifications, an itemized quotation, approved materials and finishes, controlled manufacturing, documented quality control and export-ready delivery.
You provide the design intent. We provide the manufacturing control needed to build it correctly.
For Interior Designers · Architects · Developers · Procurement Teams · Private Clients
Already have a complete BOQ? See Review OptionsYour files do not need to be packaged perfectly. Our first step is to identify what is ready, what is missing and what requires approval.
Defined Product → Approved Specification → Comparable Price
One accountable workflow Approval before production Evidence before shipment
Villa Furniture Breakdown · Dimensions / Construction / CMF
02 MANUFACTURING CAPABILITY
Reliable manufacturing is not one machine or one sales desk. Product development, material sourcing, woodworking, finishing, upholstery, inspection, packing and project communication work from the same approved record.
Want to see the production system behind the project?
Explore Our Foshan Manufacturing SystemFOSHAN MANUFACTURING Woodworking
03 / ONE STANDARD, EVERY PROJECT
The same habits used to coordinate hospitality furniture - controlled submittals, recorded approvals, inspection evidence and pre-shipment sign-off - are applied to bespoke residential and commercial projects. The design may be unique; the control process should never be improvised.
See Hotel Furniture ManufacturingFour controls. One accountable standard.
SELECT A STANDARD TO VIEW THE RELATED STAGEHospitality project evidence
03 PROJECT ENVIRONMENTS Swipe to view all three projects →
04 / CONTROLLED PROJECT WORKFLOW
Your project moves through a sequence of reviewable decisions. At every stage, you can see what information is being used, what requires approval and what document allows the project to move forward.
See the Complete Design-to-Delivery WorkflowREVIEWABLE DECISION 01
Align the project direction before individual items move into development.
REVIEWABLE DECISION 02
Translate the approved direction into buildable furniture definitions.
REVIEWABLE DECISION 03
Resolve open questions and maintain one current project revision.
REVIEWABLE DECISION 04
Compare physical evidence with the recorded specification before release.
REVIEWABLE DECISION 05
Manufacture against the approved record and return visible progress evidence.
REVIEWABLE DECISION 06
Protect finished items and coordinate their controlled project handover.
Align the project direction before individual items move into development.
Translate the approved direction into buildable furniture definitions.
Resolve open questions and maintain one current project revision.
Compare physical evidence with the recorded specification before release.
Manufacture against the approved record and return visible progress evidence.
Protect finished items and coordinate their controlled project handover.
05 / REFERENCE WORK, BESPOKE OUTCOME
Reference projects show our ability to understand a material language, detailing level and complete furniture programme. They are evidence of relevant execution - not templates. Your drawings, dimensions, CMF schedule and workmanship requirements remain the authority for your project.
View Villa ProjectsProduction capabilities shown in context
Whole-Home Furniture Programme
Furniture developed consistently across connected rooms.
Coordinated Multi-Room Interior
Wood, stone, metal and upholstery coordinated as one palette.
Bespoke Seating Collection
Proportion, comfort, tailoring and fabric application controlled by item.
Detailed Residential Interior
Sculptural forms and detailed finishes translated into production requirements.
06 / YOUR PROJECT TEAM
Your drawings should not be reinterpreted by disconnected departments. One coordinated project team carries the approved information through technical review, BOQ and quotation, material approval, factory supervision and quality reporting.
Owns the timeline, meeting record, key decisions and client communication.
Maintains the BOQ, quotation, sourcing status and approval log.
Translates design intent into dimensions, materials and production-ready details.
Checks feasibility, production status, corrective action and pre-shipment readiness.
Owns the timeline, meeting record, key decisions and client communication.
TIMELINE · DECISIONS · COMMUNICATIONMaintains the BOQ, quotation, sourcing status and approval log.
BOQ · QUOTATION · SOURCING · APPROVALSTranslates design intent into dimensions, materials and production-ready details.
DRAWINGS · DIMENSIONS · MATERIALS · DETAILSChecks feasibility, production status, corrective action and pre-shipment readiness.
FEASIBILITY · STATUS · CORRECTION · RELEASE07 / CHOOSE YOUR SERVICE SCOPE
You do not need to purchase another design package. If your drawings and specifications are ready, we begin with manufacturability review, item breakdown, CMF confirmation, quotation and production planning. If critical information is missing, add only the drawing-deepening support required to close the gaps.
Use this path when dimensions, construction details, joinery, material codes or room coordination are incomplete.
08 / ITEM SCHEDULE
Before a product is quoted or manufactured, it is registered by room, location, item code, dimensions, quantity, orientation and reference. This turns a collection of drawings and images into a traceable furniture schedule.
ITEM IDENTITY RECORD
This blue-sofa identity example is separate from the P8 living-layout illustration above.
Select a record to locate the same numbered item on the plan. Source fields not visible in P8 remain marked TBC.
Item LIV-2S-RH-01 is selected and linked on the plan.
P8 Furniture Layout · Dimensions / Quantity / Handing
09 / PRODUCT BREAKDOWN
For each product, we record overall dimensions, construction, frame, filling, upholstery, visible surfaces, hardware, special craftsmanship and unresolved questions. This removes guesswork before pricing, sampling and manufacturing.
Full furniture breakdown page is visible.
Full Product Breakdown
10 / CMF APPROVAL
Subjective descriptions are converted into coded physical samples. Fabric, leather, veneer, stone, metal tone, paint colour and surface sheen are reviewed against the same item record before production release.
Colour + Material + Finish, connected to a named furniture item and a recorded approval status.
Filter the evidence, then select a sample to inspect its record.
Example Record
Example fields shown for workflow demonstration. Replace these codes and statuses with the approved record for the live project.
11 / ITEMIZED QUOTATION
Price is connected to a defined item, dimension, quantity, material, finish, build level and inclusion. Alternative options are shown separately, so a lower price cannot hide an unapproved change in specification.
01
ITEM BASIS
02
STANDARD CUSTOM
03
PRICE BASIS / REDACTED
MDF + solid wood frame / standard lacquer / engineered veneer
Unit: redacted / Total: confirmed after final scope
Hover, focus or select an option to match it with the document above.
Source-note: the example does not state an explicit unit for the reference dimensions or separate included/excluded-work columns. Those fields remain identified for formal quotation confirmation instead of being invented here.
This is not a formal purchase, tender or contractor quotation.
A free initial review provides general project understanding and a rough price direction. Detailed item-by-item BOQ analysis and a formal PDF/XLSX quotation are covered by the $500 Project Start Fee, deductible from a future furniture order.
12 / QUALITY GRADES AND VALUE ENGINEERING
A lower price is useful only when you can see what changes. Each option is defined by construction, material, finish, durability and design fidelity before it enters the quotation.
Select one lens to isolate that trade-off across all five build levels.
All six comparison dimensions are visible.
Simplified construction, materials and surface detailing.
Protects the main visual character while controlling less-visible cost.
Reliable construction and repeatable finishes for coordinated project use.
Upgraded structure, materials and finishing for closer design fidelity.
Maximum fidelity and the highest level of material and detail control.
Illustrative build-level framework. Final construction, materials, finish and performance are confirmed item by item before quotation and production release.
These three details come from the same Villa furniture breakdown record. Select one to compare its related dimension above.
Source evidence: P12 quality-grade comparison and Villa Furniture Breakdown / CMF verification. Images illustrate the review method; the approved project specification governs.
When the price changes, the specification changes visibly - not through a hidden downgrade.
No build level carries a fixed price. Each quotation follows the item-specific approved basis.13 / ENGINEERING AND DOCUMENTED QC
Before materials are released, design intent is translated into buildable shop drawings. Critical dimensions, frame construction, joints, upholstery build-up, hardware, interfaces, finish codes and tolerances are reviewed. The approved revision becomes the shared baseline for production and inspection.
The factory and the inspector work from the same approved revision.CMF code and approved material reference
Material type, colour, grain, thickness and approved reference.
Dimensions, joints, reinforcement and structural stability.
Construction, upholstery build-up, alignment and accessible details.
Dimensions, appearance, function, stability and finish quality.
Quantity, accessories, labels, condition and packing readiness.
Material Inspection is highlighted on the engineering record.
Deviations are found while they can still be corrected - not after the container arrives.
14 / LOGISTICS, DELIVERY AND AFTERCARE
A shipment is successful only when the receiving team can identify, handle, assemble and report every item correctly. The furniture schedule remains connected to packing lists, case marks, packing photos, hardware lists and installation information.



15 / EXPORT PACKAGING
Upholstery, veneer, lacquer, metal, glass and stone have different surfaces, weights and weak points. Their protection, support and outer-pack structures are therefore selected according to the product and delivery route.
16 / PROJECT DELIVERY TIMELINE
A reliable lead time starts with approval gates, not a production guess. Engineering, material approval, manufacturing, QC, packing, freight and installation must be planned as one connected path.
Depending on file completeness and approval speed.
After drawings, materials and commercial scope are approved.
When catalogue products are selected.
After production completion.
China to Costa Rica in the PDF reference scenario.
Other destinations require a route-specific estimate.When installation is included and the site is ready.
The target date becomes credible only when every approval and handover date has an owner.
17 / FROM TODAY TO PROJECT KICKOFF
Send your drawings, BOQ, reference images, dimensions, material requirements, destination and target date. We will organize the available information and show you the appropriate next step.
Do not have every file yet? Start with the information available. We will identify what is missing.
Clients who need an initial conversation, general project understanding and early budget direction.
SCOPE LIMITThe free review does not include item-by-item BOQ analysis, detailed material recommendations, formal production feasibility checking, a detailed schedule or a formal factory quotation.
Request a Free Initial ReviewProjects ready for item-by-item factory analysis, detailed pricing and production planning.
The $500 Project Start Fee is fully deductible from your future furniture order.
Start Detailed BOQ Review - $500Choose the free initial review or detailed BOQ review.
Organize files, contacts, scope and decision responsibilities.
Identify missing information, risks and required approvals.
Confirm the commercial scope and route toward sampling or production.