China Project Procurement & Supply-Chain Support for Contractors

Turn your BOQ, drawings and required-on-site dates into a controlled China-side procurement plan. ChiuChiu supports factory quotations, supplier coordination, technical clarification, production follow-up, quality inspections, packing and delivery coordination for FF&E, custom joinery and agreed interior-material packages.

Built for general contractors, builders, developers, quantity surveyors, procurement managers and project managers.

  • BOQ Review
  • Factory Quotations
  • Supplier Coordination
  • Schedule Tracking
  • QC Evidence

Where Low Quotes Become Project Risk

The Lowest Quote Is Not Always the Lowest Project Cost

Contractors rarely struggle because there are no suppliers in China. They struggle because quotations, drawings, suppliers, approvals and delivery milestones are not controlled as one project.

Different Scope Fragmented Control Late Evidence
01RFQ / Scope

Quotes You Cannot Compare

One supplier excludes hardware. Another changes the material. A third prices different dimensions. The totals may look comparable, but the scopes are not.

Furniture technical drawing under review for dimensions, finish and scope coordination
02Drawing / RFI

BOQ and Drawing Gaps

Missing dimensions, finishes, interfaces or performance requirements force factories to guess, creating inaccurate quotations and later variations.

03Supplier Control

Too Many Suppliers, No China-Side Owner

When every factory reports separately, your team becomes the coordination office across languages, time zones and production systems.

04Cost / Exclusions

Hidden Project Costs

Samples, tooling, packing, testing, domestic transport and freight may sit outside an attractive unit price.

05Schedule / Milestones

Delivery Dates Without Visibility

“On schedule” means little unless drawings, samples, materials, production, inspection, packing and shipment are individually tracked.

Inspector examining a finished furniture surface under focused light before release
06QC / Nonconformity

QC That Starts Too Late

A defect found after shipment is slower and more expensive to resolve than a nonconformity recorded before release.

The problem is not simply finding suppliers. It is controlling multiple suppliers as one project.

Planning your first procurement package in China? Read our China furniture sourcing guide before preparing the RFQ.

Industry context: AGC’s 2026 outlook tracks persistent material-cost and supply-chain pressures, while AIA guidance connects clear, coordinated drawings and specifications with more accurate bids and fewer RFIs, change orders, rework and delays.

China-Side Project Control

One China-Based Control Layer Between Your Team and Multiple Suppliers

Your project team keeps control of design, budget and approvals. ChiuChiu manages the agreed China-side actions through one supplier register, document trail, procurement schedule and escalation path.

  1. Interface 01 Decision Owner

    Client Project Team

    Retains authority over project design, commercial limits, approvals and required-on-site priorities.

    DesignBudgetApprovals
  2. Control Layer One Interface

    ChiuChiu China Project Interface

    Translates approved requirements into controlled actions, records, milestones and escalations across the China supply chain.

    Supplier RegisterDocument TrailScheduleEscalation
  3. Interface 03 Execution

    Specialist Factories

    Execute the agreed manufacturing, technical, inspection, packing and delivery requirements by package.

    FF&EJoineryMaterialsPacking

Four Connected Control Modules

One project record / Multiple specialist packages

01 Commercial Record

Commercial Control

Normalized RFQs, comparable factory quotations, inclusions, exclusions, payment assumptions and agreed Incoterms.

02 Technical Record

Technical Control

BOQ and drawing review, RFIs, material clarification, shop drawings, samples and approval records.

03 Milestone Record

Schedule Control

Procurement milestones, planned-versus-actual dates, long-lead risks, recovery actions and decisions required.

04 Release Record

Quality & Delivery Control

Inspection checkpoints, nonconformity records, corrective actions, packing labels and shipment documents.

Project Categories & Supply Scope

Coordinate the Package by Project, Not by Supplier

ChiuChiu helps project teams organize agreed categories into one procurement structure, while keeping the manufacturer, specification, approval status and responsible party visible for every package.

Completed private-villa interior with coordinated furniture and architectural finishes Project-Wide Package View
One Procurement Structure Coordinate categories around the project scope.
Custom upholstered sofa representing loose furniture and FF&E production Furniture Package
01Foshan Production

Loose Furniture & FF&E

Sofas, lounge chairs, dining furniture, beds, desks, tables, casegoods and movable project furniture.

Fixed hotel furniture with wall panels wardrobes vanities and built-in cabinetry Joinery Package
02Foshan Production

Fixed Furniture & Custom Joinery

Wardrobes, vanities, wall panels, counters, built-in cabinetry and project-specific architectural joinery.

Decorative floor lamp representing coordinated project lighting products Specialist Package
03Approved Supplier

Lighting & Decorative Products

Decorative lighting and agreed project accessories sourced according to approved specifications and supplier capability.

Woven upholstery fabric detail representing approved soft-furnishing packages Soft-Furnishing Package
04Approved Supplier

Carpets & Soft Furnishings

Rugs, carpets, curtains, upholstery fabrics, cushions and other approved soft-furnishing packages.

Modern decorative wall mirror representing art mirrors and coordinated decor Decor Package
05Approved Supplier

Art, Mirrors & Décor

Mirrors, decorative objects, wall art and coordinated accessories for hospitality, residential and commercial interiors.

Stone and marble finish detail representing selected interior material packages Material Package
06Route Identified

Selected Interior Materials

Agreed finish and material packages that can be technically specified, sampled, inspected and documented before ordering.

BOQ & Drawing Review

Start With the BOQ, Drawings and Required-on-Site Date

Direct AnswerA factory quotation is only reliable when quantities, dimensions, materials, finishes, interfaces, packing requirements and delivery assumptions are visible. Missing information should be recorded and clarified—not silently guessed.

Sanitized BOQ Review / Working Evidence Client Data Removed
Conflict / Dimensions Do Not Match Missing / Finish Code Confirm / Quantity
Redline Before RFQ

Use a client-approved, sanitized BOQ screenshot here. Red annotations make conflicts, omissions and decisions visible before supplier quotation.

Project Inputs

What You Send

  • BOQ or furniture schedule
  • Floor plans, elevations and sections
  • CAD or PDF drawings
  • Finish and material schedules
  • Renderings and reference images
  • Target budget
  • Required-on-site date
  • Destination port or project location
  • Preferred delivery terms, if known

What You Receive

What ChiuChiu Prepares

  • Classified item register
  • BOQ and drawing discrepancy log
  • Missing-information list
  • RFI schedule
  • Supplier-category plan
  • RFQ readiness review
  • Initial lead-time risk list
  • Quotation assumptions
Submit Your BOQ for a Detailed Factory Review

Factory Quotation Standardization

Compare Factories on the Same Technical and Commercial Basis

A useful factory quotation does more than show a unit price. ChiuChiu aligns quotations against the same BOQ code, quantity, dimensions, material, finish, hardware, packing and commercial assumptions so your team can identify the lowest compliant offer—not simply the lowest number.

Five-Step Process

RFQ to Approval

  1. Prepare One RFQ Structure

    Convert available project documents into one consistent supplier request.

  2. Match Suppliers by Capability

    Select manufacturing routes according to category, quantity, finish and technical complexity.

  3. Normalize the Quotations

    Record substitutions, exclusions and different assumptions before comparison.

  4. Identify Alternatives

    Where requested, propose value-engineering options without hiding changes to appearance, durability or performance.

  5. Prepare the Commercial Summary

    Present the compliant options, risks, decisions required and next approval step.

See What the Detailed Factory Quotation Includes

Normalized Commercial Review

Supplier Comparison Matrix

Illustrative & sanitized comparison / Not a live project quotation

Initial comparison result Supplier A / Compliant Supplier B / Clarify Supplier C / Compliant
Normalized comparison of the project RFQ basis and three illustrative factory quotations.
Comparison Field Normalized RFQ Basis Supplier A Supplier B Supplier C
BOQ item code LF-07 LF-07 LF-07 LF-07
Product description Upholstered lounge chair Upholstered lounge chair Supplier-standard lounge chairDifferent description Upholstered lounge chair
Supplier Approved capability route Illustrative Supplier A Illustrative Supplier B Illustrative Supplier C
Quantity 128 pcs 128 pcs 128 pcs 128 pcs
Dimensions 760 × 820 × 780 mm 760 × 820 × 780 mm 740 × 800 × 760 mmDimension mismatch 760 × 820 × 780 mm
Material and substrate Plywood shell + solid ash frame Plywood shell + solid ash frame MDF shell + rubberwood frameMaterial substitution Plywood shell + solid ash frame
Finish Walnut stain W-04 + approved fabric W-04 + approved fabric Standard walnut tone + PUNot compliant W-04 + approved fabric
Hardware or accessories Nylon glides required Nylon glides included Glides excludedExcluded Adjustable glides includedAlternative
Sample or tooling cost Disclose cost and credit terms USD 280 / credited after order USD 180 / non-refundableDifferent assumption USD 320 / credited after order
Packing method Export carton, foam and corner protection Export carton, foam and corner protection Standard carton onlyPacking gap Export carton, foam and corner protection
Testing or document requirements Material, finish and inspection records Included as stated in RFQ Not quotedOpen scope Included as stated in RFQ
Production lead time Maximum 60 days after approvals 55 days after approvals 42 days from depositDifferent start point 60 days after approvals
Quotation validity Minimum 30 days 30 days 15 daysShort validity 30 days
Incoterm and named place FOB Shenzhen FOB Shenzhen EXW FoshanDifferent cost basis FOB Shenzhen
Included items Product, approved finish, glides and export packing Product, approved finish, glides and export packing Product onlyIncomplete inclusion Product, approved finish, glides and export packing
Excluded items Post-FOB freight and destination charges Post-FOB freight and destination charges Export packing, documents and export handlingMaterial exclusions Post-FOB freight and destination charges
Unit price Compare only after scope normalization USD 268Lowest compliant USD 239Lowest number / Not comparable USD 276
Package total 128 pcs / normalized inclusions USD 34,304Compliant basis USD 30,592Scope incomplete USD 35,328
Lowest Listed Unit Price Supplier B / USD 239 / Clarification required
Lowest Compliant Offer Supplier A / USD 268 / Normalized scope

Illustrative supplier comparison only. Supplier names, prices, lead times and terms are fictional and do not represent a live project quotation. Copper identifies a declared alternative or different assumption; red identifies missing, excluded or non-compliant scope.

Design Deepening & Technical Clarification

Close Technical Gaps Before They Become Variations, Rework or Site Delays

Architectural drawings communicate design intent, but factories still require confirmed dimensions, interfaces, materials, finishes, hardware and construction details before production can begin.

Representative Workflow Evidence Images may represent different projects / Not an item-by-item project record
  1. Architectural and furniture technical drawing board representing design intent before shop-drawing development Architectural Design Drawing
    01 Client / Design Input

    Design Intent

    Architectural drawings, renderings, BOQ information and approved aesthetic direction define what the project is trying to achieve.

  2. Furniture shop drawing under review for dimensions, interfaces and construction details before production REV. C / Shop Drawing 600 mm / Elevation 550 mm / BOQ RFI-014 / Revision Required
    02 Controlled Technical Record

    Production Information

    Confirmed dimensions, interfaces, materials, finishes, hardware and construction details are coordinated into a current revision.

  3. Full-colour completed fixed furniture and joinery detail representing the manufactured result after approval Representative Finished Detail Approved Result
    03 Manufacturing Output

    Manufactured Result

    The released production information becomes the reference for manufacturing, inspection and the recorded approval trail.

Technical Support Scope

9 Coordinated Review Activities

  • Drawing and BOQ cross-checking
  • Manufacturability review
  • Dimension and interface clarification
  • Material and finish identification
  • Hardware coordination
  • Sample and mock-up requirements
  • Shop-drawing coordination
  • Revision and approval tracking
  • Agreed value-engineering options

Procurement Schedule & Delivery Management

Turn Supplier Promises Into a Visible Procurement Schedule

Direct AnswerChiuChiu plans backward from the required-on-site date and tracks the agreed package through approvals, purchasing, production, inspection, packing and shipment readiness.

Illustrative / Sanitized Back-Planned Schedule

Milestone Sequence & Planned Dates

Required On Site Week 18 / Back-Planned
  1. SCOPE CONFIRMATIONGreen — On Plan
    CompleteW01
  2. RFQGreen — On Plan
    CompleteW01–02
  3. SUPPLIER SELECTIONGreen — On Plan
    CompleteW02–03
  4. SAMPLESAmber — Decision Required
    Approval openW03–05
  5. SHOP DRAWINGSAmber — Recovery Required
    RFI openW04–06
  6. MATERIALSRed — Milestone Missed
    Release missedW06–08
  7. PRODUCTIONGreen — On Plan
    In progressW08–12
  8. IN-PROCESS QCGreen — On Plan
    CheckpointW10–11
  9. PRE-SHIPMENT QCAmber — Decision Required
    Hold pointW13
  10. PACKINGGreen — On Plan
    PlannedW13–14
  11. CONSOLIDATIONGreen — On Plan
    PlannedW14–15
  12. DISPATCHGreen — On Plan
    ReleaseW16

Illustrative planning structure only. The approved project schedule, recorded decisions and actual package status govern live dates. The vertical reference line marks the example Week 07 reporting point.

Illustrative Weekly Procurement Report Excerpt Weekly Procurement Report
Report Week 07Rev. 03Client Data Removed
Project: Example / Sanitized Required On Site: Week 18 Packages Tracked: 03 Open Decisions: 02
Illustrative sanitized weekly procurement report containing the eleven agreed status fields and no client data.
Package and supplier Planned milestone Planned date Actual date Variance Current status Risk or delay reason Recovery action Decision required Responsible owner Impact on shipment
PKG-01 Guestroom Joinery / Supplier 01 Shop-drawing approval Week 07 / Mon Week 07 / Mon 0 days Green / On Plan None recorded Continue approved plan None Technical Coordinator None
PKG-02 Custom Joinery / Supplier 02 Shop-drawing approval Week 07 / Tue Open +3 days Amber / Recovery Required Final wardrobe depth and handle set not confirmed Issue consolidated RFI and pre-book approved board Confirm WD-03 depth before Week 07 close Client PM / Technical Coordinator None if approved this week; +7 days otherwise
PKG-03 Decorative Lighting / Supplier 03 Material release Week 06 / Fri Not achieved +6 days Red / Milestone Missed Driver approval remains unresolved Confirm alternate driver and expedite release Client electrical decision Procurement Lead Dispatch at risk / 5 days

Illustrative and sanitized report structure only. Package names, suppliers, relative dates, variance and status are fictional and do not represent a live project.

“On schedule” should be supported by visible milestone evidence—not only a supplier message.

Procurement Quality Control & Corrective Action

Inspect Against Approved Documents, Not Memory

Inspection begins with an approved reference: the current drawing, confirmed specification, signed sample or agreed checklist. The inspection scope and acceptance criteria are defined by product category before production.

Three QC Stages

Representative inspection photography / Images may show different products or projects

  1. Material and finish samples prepared for project confirmation before furniture production Representative Inspection Photography
    Approved SampleReference
    Before Production

    Pre-Production Control

    Confirm approved materials, finishes, hardware, construction details, samples and inspection references.

    Current DrawingSigned SampleChecklist
  2. Furniture components being machined and checked against approved production information Representative Inspection Photography
    In-Production InspectionProcess Check
    During Production

    In-Process Inspection

    Check critical dimensions, structure, material use, workmanship, finish consistency and visible production risks while correction is still practical.

    DimensionsStructureWorkmanship
  3. Inspector checking the surface of finished furniture under focused light before packing and release Representative Inspection Photography
    Pre-Shipment InspectionRelease Check
    Before Release

    Pre-Shipment Inspection

    Verify quantity, appearance, dimensions, function, accessories, labels, packing and shipment readiness before release.

    QuantityFunctionPackingRelease
Illustrative / Sanitized QC Report Example QC Report Should Show
QC-EXAMPLE-09Rev. 02Client Data Removed
Quality Inspection Report / Fictional Example Inspection Type: Pre-Shipment Open NC: 01 Reinspection: Recorded
Photographic Evidence Illustrative Finding / NC-02
Representative inspection photograph showing a finished furniture surface under focused light
Example evidence overlay / Surface finding recorded against approved reference
Representative approved sample reference
Reference
Representative in-process inspection record
Process
Representative pre-shipment reinspection record
Recheck
Illustrative sanitized QC report excerpt listing the twelve required report fields and fictional example values.
Inspection date and location Illustrative date / Foshan, China
Supplier and purchase-order reference Supplier 02 / PO-EXAMPLE-014
Item code LF-07 / Lounge Chair
Inspection basis Approved drawing Rev. C / confirmed finish sample / agreed inspection checklist
Quantity inspected Illustrative sample: 12 of 48 units
Photographic evidence Photo set QC-EX-014 / 12 images / representative thumbnails shown
Conformity or nonconformity Nonconformity recorded / NC-02
Defect description Illustrative finding: inconsistent edge finish on two inspected units
Corrective action Rework the affected edge finish and submit corrected units for reinspection
Responsible party Illustrative supplier QC lead / ChiuChiu inspection coordinator
Reinspection result Example outcome / Reinspection passed
Release status Illustrative conditional release / Packing hold cleared after recheck

Illustrative and sanitized report structure only. Supplier name, purchase-order reference, item code, date, quantity, finding, corrective action and release outcome are fictional and do not represent a live client inspection.

Corrective-Action Control

Nonconformities are recorded against the approved reference, assigned for corrective action and rechecked before shipment release. Third-party inspection can be arranged when required by the contract.

Approved ReferenceRecord NCAssign ActionReinspectRelease Status
Quality-Control ResourceReview the Furniture QC Process

Multi-Supplier Consolidation, Packing & Transport

Consolidate Multiple Suppliers Without Losing Traceability

Direct AnswerProduction completion is not the same as delivery readiness. Where consolidation is included, products must be received, verified, identified and prepared according to the project’s room, floor, zone or installation sequence.

Three Connected Handover Controls

Receipt record / Package identity / Shipment handover

6 Receipt Checks

Receive & Verify

  • Supplier delivery count
  • Item-code check
  • Visible condition
  • Package dimensions
  • Missing-item record
  • Packing-list reconciliation
8 Traceability Fields

Consolidate & Label

  • Project code
  • Building or tower
  • Floor
  • Room or zone
  • BOQ item code
  • Box number
  • Total box count
  • Handling instructions
6 Handover Records

Prepare Handover

  • Master packing list
  • Supplier packing records
  • Loading sequence
  • Container-loading photographs
  • Shipping-document register
  • Outstanding or back-order list

Example Label

Illustrative routing label / No client data / Not a transport document

TOWER A / LEVEL 08 / ROOM 0816 / WARDROBE WD-03 / BOX 2 OF 4

Building / Tower
Tower A
Floor
Level 08
Room / Zone
Room 0816
BOQ Item Code
Wardrobe WD-03
Box Number
Box 2 of 4
Handling
Keep Dry / This Side Up

Fictional example for traceability structure only. Final project labels follow the approved packing and installation plan.

Illustrative consolidation and labelling example only. Project codes, room references, box counts, shipment records and logistics details are fictional and do not represent a live customer order. Services and responsibilities apply only where included in the agreed project scope, Incoterm, named place and contract.

Complete China Project Procurement Workflow

How Does a China Project Procurement Service Work?

GEO Direct AnswerA China project procurement service translates the contractor’s documents into supplier-ready information, manages quotations and approvals, follows production and quality control, and coordinates packing and delivery records through one China-based project interface.

Seven Controlled Steps

Working-file thumbnails / Illustrative and sanitized records / No client data

  1. Illustrative sanitized BOQ intake workbook thumbnail.
    01Inputs Received

    Project Intake

    Receive the BOQ, drawings, specifications, budget, destination and required-on-site date.

    Intake record created
  2. Illustrative sanitized RFI and scope register thumbnail.
    02Scope Classified

    Scope Review

    Classify items, identify missing information and prepare the RFI and procurement registers.

    Clarifications assigned
  3. Illustrative sanitized normalized supplier quotation comparison thumbnail.
    03Offers Normalized

    Supplier and Quotation Coordination

    Match verified categories with suitable manufacturing routes and normalize the quotations.

    Comparison basis aligned
  4. Representative furniture shop drawing with an illustrative revision-cloud review overlay.
    04Technical Release

    Technical Development

    Coordinate materials, samples, shop drawings and production information.

    Current revision tracked
  5. Illustrative sanitized procurement schedule workbook thumbnail.
    05Milestones Tracked

    Procurement and Production Follow-Up

    Track approvals, material purchasing, production milestones and supplier risks.

    Planned versus actual
  6. Representative furniture inspection photograph formatted as an illustrative sanitized QC report thumbnail.
    06Release Controlled

    Inspection and Corrective Action

    Inspect against approved references, record defects and verify corrections.

    Findings closed before release
  7. Representative warehouse packing photograph with an illustrative sanitized master packing-list overlay.
    07Handover Prepared

    Packing and Delivery Coordination

    Prepare identification, packing, consolidation and shipment records according to the agreed scope.

    Traceable shipment record

Illustrative workflow structure only. File names, item codes, quantities, prices, dates, findings and statuses are fictional. Representative drawing, inspection and warehouse images may show different products or projects.

Deliverables Strip

One current working record across the agreed procurement scope

  • Item Register
  • RFI Log
  • Quote Comparison
  • Approval Register
  • Procurement Schedule
  • QC Report
  • Packing List

Single Verified Project Evidence Chain

See the Approval Trail, Not Just the Final Photograph

A credible project case should show how the package moved from approved information to manufactured and delivered products. This evidence chain helps contractors evaluate document control, material consistency, production visibility, inspection quality and packing readiness—not only the final interior photography.

Verified Completed-Project Image Required Upload: marriott-project-completed-result.jpg One Project / One Controlled Record
Completed Project / Approved Archive Evidence Suzhou Yangcheng Lake Taikang Marriott

Approval-to-Delivery Evidence Trail

Six records from the same project / No unrelated case-study imagery

  1. Approved Scope Evidence RequiredUpload: marriott-project-approved-scope.jpg Approved BOQ / Drawing

    Approved Scope

    The current BOQ item, drawing revision and agreed package boundary establish the controlled starting point.

    Approved information
  2. Material Approval Evidence RequiredUpload: marriott-project-material-approval.jpg Material Sample

    Material & Finish Approval

    Approved substrates, colours, textures, hardware and finish references provide the inspection basis.

    Signed reference
  3. Shop-Drawing Evidence RequiredUpload: marriott-project-shop-drawing.jpg Shop Drawing

    Production Information

    Confirmed dimensions, interfaces, construction details and the current revision prepare the item for release.

    Current revision
  4. Factory-Progress Evidence RequiredUpload: marriott-project-factory-progress.jpg Production

    Factory Progress

    Visible production records connect the released information to materials, workmanship and current status.

    Milestone evidence
  5. Pre-Shipment QC Evidence RequiredUpload: marriott-project-pre-shipment-qc.jpg Pre-Shipment QC

    QC & Corrective Action

    Inspection findings are recorded against the approved reference, corrected and rechecked before release.

    Release control
  6. Packing or Delivered Evidence RequiredUpload: marriott-project-packing-delivered-result.jpg Packing / Installed Result

    Packing & Delivered Result

    Package identity, protection and delivery records preserve traceability through the final handover stage.

    Traceable handover

Free Initial Review or Detailed Factory Quotation

Choose the Right Starting Point for Your Project

Start with a short project discussion when the scope is still exploratory, or move directly into a structured BOQ review when your team needs an itemized factory quotation for internal approval, contractor comparison or purchasing decisions.

No Project Start Fee

Free Initial Project Review

Suitable when your team needs an initial discussion before committing to a detailed quotation process.

  • 15–20 minute project call
  • General scope discussion
  • Initial understanding of categories
  • Rough price-range direction
  • Recommended next step
Contact the Project Team
Structured Factory Review

Detailed BOQ Review & Factory Quotation

Suitable when your team is ready for a structured, itemized review based on the available BOQ, drawings and specifications.

  • Item-by-item BOQ review
  • Material and finish suggestions
  • Manufacturing-feasibility review
  • Classification by room and product
  • Production-complexity review
  • Timeline estimate
  • Shipping direction and rough export estimate
  • Formal PDF/XLSX factory quotation
Project Start Fee USD 500
Current product page states fully deductible from a future furniture order
Order the Detailed BOQ Review — USD 500

Contractor Procurement FAQ

Questions Contractors Ask Before Sourcing From China

Clarify the working scope, required documents, production boundaries, inspection records and consolidation responsibilities before suppliers are appointed.

Who is this service for?

This service is designed for general contractors, builders, developers, quantity surveyors, procurement managers and project managers who need a China-side team to coordinate quotations, technical information, suppliers, production, inspections and delivery records.

What documents do I need to provide?

Send the most current BOQ, drawings, specifications, finish schedules, reference images, target budget, destination and required-on-site date. If some information is unavailable, it will be recorded as an assumption, clarification request or outstanding decision.

Can you review an incomplete BOQ?

Yes. ChiuChiu can identify missing quantities, dimensions, materials, finishes and interfaces. However, incomplete information may limit quotation accuracy, and the responsible project party must approve the required clarifications before production.

Does ChiuChiu manufacture every category?

No single factory should be presented as producing every furniture and interior-material category. ChiuChiu manufactures agreed furniture packages through its production system and coordinates approved specialist suppliers for other verified categories.

How is procurement quality control documented?

Inspection is completed against approved drawings, specifications, samples or checklists. Reports should show the items inspected, photographic evidence, nonconformities, corrective actions, reinspection results and final release status.

Can products from multiple suppliers be consolidated?

Consolidation can be coordinated where it is included in the agreed scope. Products are received, reconciled, labeled and prepared according to the project’s building, floor, room, zone or installation sequence.